2 Days

Apply Hot Mix Asphalt

Techniques for applying hot mix asphalt in road construction and repair.

2 Days

Apply Productivity Principles on a Construction Site

Improving productivity through effective resource utilization and time management.

2 Days

Apply Quality Principles on a Construction Site

Quality management principles, inspection methods, and testing procedures.

2 Days

Batch and Mix Concrete by Volume

Correct batching and mixing of concrete to required specifications.

3 Days

Bricklaying

Bricklaying techniques, mortar mixing, wall construction, and structural applications.

3 Days

Concrete Hand

Mixing, pouring, and finishing concrete by hand.

3 Days

Conduct a Bituminous Seal Operation

Application of bituminous seals to improve and protect road surfaces.

2 Days

Construction Supervisor

Supervising construction teams, monitoring costs, site administration, work planning, and contract documentation.

3 Days

Culverts

Design, installation, and maintenance of culverts for drainage infrastructure.

1 Day

Describe & Interpret the Construction Industry

Overview of construction industry role players, processes, and functions.

1 Day

Establish and Prepare a Work Area

Site establishment, layout planning, equipment setup, and safety preparation.

2 Days

Fence Erecting

Installation and repair of various fencing systems.

2 Days

Gabions

Use of gabions for erosion control, retaining structures, and environmental protection.

3 Days

Guardrails

Installation, repair, and maintenance of road safety barriers.

1 Day

Hand Tools

Safe use, maintenance, and care of hand tools.

2 Days

Identify, Describe and Use Materials in Civil Engineering Construction

Selection and use of civil engineering construction materials.

3 Days

Install and Maintain Road Furniture

Installation and maintenance of road signs, barriers, and lighting infrastructure.

1 Day

Introduction to Scaffolding

Scaffolding types, components, erection and dismantling basics.

3 Days

Kerb Laying

Site preparation and installation of kerbs with concrete works.

3 Days

Labour Intensive Construction (Level 2)

Labour-intensive construction planning and execution emphasizing employment creation.

3 Days

Labour Intensive Construction (Level 4)

Advanced labour-intensive construction planning and management.

3 Days

Labour Intensive Construction (Level 5)

Higher-level labour-intensive construction supervision and implementation.

2 Days

Layer Works

Construction and compaction of road layer works including sub-base and base layers.

2 Days

Maintain Records on a Construction Site

Construction record keeping, reporting, and documentation management.

3 Days

Manhole Installation

Excavation, installation, alignment, and sealing of manholes.

3 Days

Pipe Laying

Installation of water, sewer, and drainage pipe systems.

1 Day

Power Tools

Safe use, maintenance, and handling of power tools.

2 Days

Protect Banks

Erosion protection techniques for riverbanks and embankments.

2 Days

Read & Interpret Construction Drawings and Specifications

Reading plans, scales, layouts, views, and construction specifications.

3 Days

Repair Concrete and Segmented Concrete Road Surfaces

Repair and resurfacing of concrete and block pavements.

3 Days

Repair/Replace Minor Structures

Repair and replacement of minor civil structures including culverts and small bridges.

2 Days

Road Marking

Application of road markings using paint and thermoplastic systems.

3 Days

Road Patching

Repair of potholes and road surface defects.

2 Days

Road Stud Installation

Installation of reflective road studs and markers.

3 Days

Scaffold Erector

Safe erection and dismantling of scaffolding structures.

3 Days

Scaffold Inspector

Inspection of scaffolding for safety compliance and hazard identification.

3 Days

Shutter Hand

Construction, installation, and removal of concrete formwork systems.

1 Day

Small Plant

Safe operation and maintenance of small construction plant equipment.

3 Days

Steel Reinforcing

Cutting, bending, and installation of reinforcing steel in concrete structures.

3 Days

Stone Pitching

Installation of stone pitching for erosion control and slope stabilization.

3 Days

Subsoil Drains

Installation of drainage systems for groundwater management.

3 Days

Tendering

Preparation and submission of construction tenders and bids.

3 Days

V-Drains

Construction and maintenance of V-shaped drainage channels.